Civil Engineering
EE185 SEISMIC LAB CHECKLISTS, FORMS, AND MANUALS
CIVIL PROJECT MANDATORY FORMS
These checklists, forms, and manuals are required to be filled out by any Faculty or student doing work in this lab, this includes research, graduate work, or and club work.
CE Lab and Safety Rules | CGE Student/Faculty Safety Manual |
CE Project Checklist Form | Student Risk Awareness Form |
185-Seismic Table Project Checklist | 185-Seismic Table User Operation Overview |
185-Seismic Table Operation |
VICKERS PUMP OPERATION
The hydraulic pump used to drive the actuator is a Vickers brand that is equipped with two 100 HP electric motors, capable of delivering 100 GPM of hydraulic fluid flow at 3000 psi. There is a very specific procedure to start up the hydraulic pump. Pump usage must be recorded to insure that proper maintenance intervals are met.
5 TON OVERHEAD CRANE SYSTEM
There is a 5-ton overhead crane system and upon training and certification, it can be used for moving specimens on and off the seismic table. Individuals MUST fill out Crane Safety Checklist EVERY day the crane is used.